Published capital-project delivery, plus a drafted process-hazard analysis example from work performed for SABIC.












| Project | Value / Location | Our scope |
|---|---|---|
| 40,000 Bbl/Hr Ship Dock with DSU and VCU | $38MM TIC | Engineering design, procurement, construction management, start-up support |
| Crude Gathering Terminal & Pipeline Pump System (150,000 bbl tank) | $14MM TIC | Engineering design and construction management |
| Crude Gathering Pipelines, 12 in. to 36 in., 5 to 120 miles | — | Project management and construction management |
| Refined Products Expansion with Ship Loading/Unloading (five 200,000 bbl tanks) | $75MM TIC | Engineering design, procurement, construction management |
Aston Monarch supports the process hazard analysis program at SABIC's Mount Vernon, Indiana complex by recording PHAs and providing senior PHA recorder capacity in collaboration with site PHA program leaders. Recorders attend PHA meetings and capture deviations, causes, safeguards and recommendations under PHA Lead guidance, producing validated study files, registers and recommendation logs.